Parklands Care Home, Inverness

BACK TO CASE STUDIES
ENQUIRE NOW
Inverness, Scotland
Deeside Timberframe - Commercial Case Study - Parklands Care Home Inverness

The Parklands Care Home in Inverness represents a flagship project in the region, with Capstone Construction and Deeside Timberframe working in close collaboration to bring this state-of-the-art facility to life. The development is set to provide a modern, energy-efficient home for up to 58 residents, with a focus on sustainability and operational efficiency.

Project Overview

The Parklands Care Home is a key project for Capstone Construction and is poised to become one of the region’s leading care facilities. As part of this collaboration, Deeside Timberframe has supplied the high-quality timber frame system, ensuring rapid construction times and exceptional build quality. The care home is a 58-bed facility, and the timber kit is being erected over a 16-week period—a remarkable achievement that underscores the speed and efficiency of timber frame construction.

Our Role

Deeside Timberframe’s offsite manufacturing process plays a pivotal role in the project’s success. By producing the timber components in a controlled environment, we ensure precision and quality, while also minimizing waste and reducing on-site construction time. This process has enabled the team to stay on schedule, ensuring that the project is delivered within the specified timeline without compromising on quality or sustainability.

Commercial Build Testimonial

Michael Cameron, Commercial Director at Capstone Construction, shared his positive experience: 

“Working with Deeside Timberframe on the Parklands Care Home project has been an exceptional experience. Their expertise has been pivotal in keeping our construction schedule on track. The speed at which the timber kit is being erected is remarkable; completing the 58-bed care home over a 16-week period is no small feat. Their commitment to quality and precision has made this project seamless, and we look forward to collaborating with them on future developments.”

Sustainability and Efficiency

One of the core benefits of using timber frame in this project is its alignment with sustainable construction practices. Timber is a renewable resource that helps reduce the carbon footprint of the building. Moreover, the precision of offsite manufacturing allows for better energy efficiency, making the Parklands Care Home both environmentally responsible and cost-effective to operate.

The Parklands Care Home is a testament to the advantages of timber frame construction, particularly in projects requiring both speed and sustainability. Deeside Timberframe’s collaboration with Capstone Construction on this project highlights our commitment to delivering high-quality, energy-efficient solutions that meet the specific needs of the healthcare sector.

For more information on how Deeside Timberframe can support your next project, contact us at info@deesidetimberframe.com or call 01569 767 123.